You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Saluran PHB Tegal Amba Ditargetkan Selesai Juni
.
photo Nurito - Beritajakarta.id

Tegal Amba Connecting Channel Dredged

The channel is normalized up to 790 meters length with one meter depth. It's targeted will be done in June

East Jakarta Water Resources Sub-dept. is normalizing the Tegal Amba connecting channel, Duren Sawit. It is to anticipate inundation in Klender, Duren Sawit, Pondok Bambu and its surrounding areas.

Today, Tuesday (4/18), four heavy equipments type mini amphibious and long-arm excavators are sent to those areas. Normalization will be carried out gradually from Jalan Zaenal Abidin until Jalan Tegal Amba, as long as 790 meters. 

Channel on Jalan Kebantenan III Dredged

East Jakarta Water Resources Sub-dept. Maintenance Section Head, Yoserizal said normalization is targeted to be completed in the forthcoming June.

"The channel is normalized up to 790 meters length with one meter depth. It's targeted will be done in June," he stated.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1219 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye910 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye736 personFolmer
  5. TMII Prepares Stuntman Show to Music Concert

    access_time23-12-2024 remove_red_eye693 personNurito